Configuration & Commissioning
Image, configure, label, asset-track, test and document equipment in a controlled environment before field deployment.

Make the deployment easier to execute and support.
Staging and commissioning reduce field time and improve consistency. 25/7 can help coordinate software images, settings, labeling, asset tracking, testing, accessories and deployment kits so equipment arrives at the site closer to ready-to-install.
Move repeatable setup into a controlled environment.
Associate labels, serials and site assignments before shipment.
Kit accessories and supporting hardware with the primary equipment.
Identify configuration or compatibility problems before deployment day.
Where this service fits.
- Media players
- Kiosks
- Commercial displays
- Room kits
- Network-connected devices
- Asset tagging
- Deployment kits
- Pre-commissioned systems

Use one stage or the full lifecycle.
Define the need, environment, standards and success criteria.
Compare viable technologies and secure project-based pricing.
Stage, image, label, asset-track and document equipment.
Coordinate logistics, qualified installers and rollout schedules.
Assist with RMAs, warranty escalation, dispatch and issue ownership.
Plan replacements, spares, expansion and lifecycle economics.
One location or one thousand, start with the project.
Tell us what you are trying to deploy. We’ll help shape the technology, pricing, staging, rollout and support path around the real requirements.